Ready for the defense supply chain?
More and more metalworking companies are receiving enquiries from the defense sector – and find out weeks later that they are not allowed to supply. Not because of their production, but because the rulebook is different. 20 years of armour steel – Armox, Ramor, Secure, S690QL, S960QL – prototypes and series production for wheeled and tracked vehicles. Support from the first enquiry through to qualification as a supplier.
Book an initial callMaterials
Ballistic steels, TL 2350, sourcing, storage, traceability.
Welding technology
DIN 2303, realistic qualification level, procedure qualifications, heat control.
Personnel
Welding supervision with a deputy, welder and NDT qualifications.
Production
Cutting to TL specification, machining and forming of high-strength steels.
QA system
ISO 9001 / 3834-2, measuring equipment, first-article process required by system integrators.
Security & law
Classified information protection, reliability vetting, export control.
Market access
Suitable end users, supplier qualification, Q3 application with an order.
Who is your welding supervisor?
Not "we have someone qualified" – name, qualification level, deputy, presence.
Show the traceability.
From batch to component, on a real part from current production – in ten minutes or not at all.
Who is responsible for export control and classified information protection?
Export officer named, goods list check, security officer. Without that, no framework contract.
EN 1090 is not enough
"We hold EN 1090 EXC3" is the most expensive misconception in this industry. EN 1090 covers steel structures as a construction product – for halls, bridges, crane runways. For a vehicle component made of armour steel, DIN 2303 applies: a different rulebook, four manufacturer qualifications (Q1–Q4), certificates issued only by accredited bodies such as GSI/SLV. Qualification realistically takes 9 to 18 months.
Calculate directly, no detour
Cutting time from DXF
Load a drawing: cutting length, pierces and cutting time per part.
Feed rate and cutting time
Laser, plasma, oxy-fuel, waterjet by thickness and power.
Plate weight
Rectangle, circle or ring, quantity, material value.
Supply chain self-check
Seven questions, a traffic light per field, next step.
Defense-Readiness-Check
Fixed price
two days on site, price quoted in the initial call
- Seven areas, a roadmap through to qualification
- Report within 10 business days
- Follow-on: qualification support with 50% credit

Material, manufacturing, qualification and business – the practical handbook for metalworking companies in the defense supply chain.
To the book
