Back to the knowledge base
Checklists
Drawing Up the Inspection Plan
Bring together every source of requirements and, for each characteristic, define how, when and by whom it is inspected.

Drawing Up the Inspection Plan
Date: 4 September 2026
0 of 8
Bring together every source of requirements and, for each characteristic, define how, when and by whom it is inspected.
Date: _______________ Part: _______________ Inspector: _______________
Bring together every source of requirements and, for each characteristic, define how, when and by whom it is inspected.
- All four sources are included: drawing, quality assurance requirements codes, rulebook and process parameters.
- Critical characteristics are classified; ballistically relevant characteristics are inspected 100 percent.
- For each characteristic, nominal value, tolerance, test equipment, inspection severity, timing and responsibility are defined.
- Process characteristics are captured, such as temperature control, heat input, re-drying and residual field.
- Sampling is used only for non-critical characteristics, justified and documented, with customer approval where necessary.
- The approval requirement has been checked: inspection specification, inspection sequence plan and quality assurance plan are submitted to the customer where required.
- Measuring equipment is available and calibrated; every tolerance is verifiable.
- The customer's forms have been obtained and are being used.