
Cover created with the help of AI.
Standort und Fertigung planen.
Hall, permits, energy and flow: the site and production planning handbook for metalworking companies.
A hall is not a plot with a roof. It is a means of production that decides for twenty years what a company can manufacture. The book walks through a site project in the order the questions arrive: What does the current site really cost? Existing hall or new build, buy or rent? What needs a permit, from whom, how long does it take? Which planners are needed, what do they cost, how are contracts closed? How do you plan material flow, layout, floor, crane and height, how do you expand later, how do you move without losing delivery capability? And what about power, photovoltaics and sustainability is obligation, what is expectation, what pays off?
A fictional metalworking company with 38 employees calculates the whole way: three site options over ten years with stress test, permit roadmap, layout in three versions, relocation in three waves. With 36 figures, checklists, calculation sheets and a note on when something belongs in the hands of professionals. Written by someone who built a factory with his team in twelve months and expanded a site. Published in German.
Four excerpts from the book
Four excerpts from the book – the preface on a factory in twelve months, how long a site project takes, the cost of being cramped and whether the company can carry a new build –, quoted verbatim from the print edition.
Reading sample in German – the book is published in German.
The book is being released at Bookmundo these days. The order link will appear here as soon as the book is live.

